The project will construct over 100 km of main canal and around 200 km of distributary and minor canals and appurtenant structures. The main canal will have a design discharge of about 38 cubic meters per second (cms) at Rasul Barrage. Provision for the canal Headworks already exists at existing Rasul Barrage on River Jhelum. However, its design and costing will be required. The project will provide irrigation supplies to about 79,950 ha in Pind Daden Khan and Khushab districts out of which around 15,000 ha will require lift irrigation from the River Jhelum with possibility of using solar energy pumps. The non-perennial irrigation system - water supply for only Kharif season crops from April to September, will directly benefit to about 500,000 rural population. The project will also include summer crop (Rabi crop) using groundwater.